Jubilee Bridge
Overview
- •The Jubilee Bridge is a former rail bridge over the Hooghly River between Naihati and Bandel in Kolkata, West Bengal, India.
- •It provided an important connection between Garifa railway station and Hooghly Ghat railway station.
Highlights
- The Jubilee Bridge is a former rail bridge over the Hooghly River between Naihati and Bandel in Kolkata, West Bengal, India.
- It provided an important connection between Garifa railway station and Hooghly Ghat railway station.
- The Jubilee Bridge was opened on 16 February 1887 in the Golden Jubilee of Queen Victoria.
- Construction began in 1882 and was completed in 1887.
- The Chief Engineer in charge of construction works was Lt Col Arthur John Barry, nephew of Sir John Wolfe-Barry, project engineer of the London Tower Bridge.
Dress Code
Modest, respectful clothing is expected at this site.
Architecture
- •Jubilee Bridge was a 366 m (1,201 ft)-long, three‑span steel cantilever truss bridge that carried the Calcutta-Bandel railway across the Hooghly River between Naihati and Bandel.
- •It was opened on 16 February 1885 after construction from 1882 to 1887.
- •It comprised two 128.10 m (420.3 ft) side spans and a 109.95 m (360.7 ft) central cantilever span, all fabricated from Hawks Crawshay and James Goodwin steel and assembled entirely by riveting without nuts or bolts.
Temple Layout
- •Jubilee Bridge was a 366 m (1,201 ft)-long, three‑span steel cantilever truss bridge that carried the Calcutta-Bandel railway across the Hooghly River between Naihati and Bandel.
- •It was opened on 16 February 1885 after construction from 1882 to 1887.
- •It comprised two 128.10 m (420.3 ft) side spans and a 109.95 m (360.7 ft) central cantilever span, all fabricated from Hawks Crawshay and James Goodwin steel and assembled entirely by riveting without nuts or bolts.
Things to Do
Visit Jubilee Bridge
FlexibleThe Jubilee Bridge is a former rail bridge over the Hooghly River between Naihati and Bandel in Kolkata, West Bengal, India. It provided an important connection between Garifa railway station and Hooghly Ghat railway station.
Frequently Asked Questions
The Jubilee Bridge is a former rail bridge over the Hooghly River between Naihati and Bandel in Kolkata, West Bengal, India. It provided an important connection between Garifa railway station and Hooghly Ghat railway station.
It is about 4.8 km from central Chandannagar.
The most comfortable months are January, February, November and December; April is the hottest, with highs around 34°C.
Quick Information
Best Time
October to March
Related Topics
Tour Packages for Chandannagar
Explore More of Chandannagar
Destination Hub
Chandannagar OverviewSpiritual & Temple Guides
Places to Explore
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction
Discover attraction












